MU
Digital TwinTank FarmBL-127
Back

Blower BL-127 — Digital Twin

Normal

BL-127 · Blower · Tank Farm / Blower Area 2 · Running · Normal Load

Criticality: Medium · Degradation: Normal

88%

Healthy

Failure Probability

18%

Remaining Useful Life

302 Days

Predicted Failure Mode

Impeller Erosion / Cavitation

RUL Confidence

79%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

97%

Trailing sensor-fused health

Live

Current

88%

Failure probability 18%

AI Predicted

Predicted · 302d horizon

84%

Impeller Erosion / Cavitation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.74 mm/s2–5 mm/sNormal-0.24/hr
Temperature45.78 °C40–70 °CNormal-0.23/hr
RPM1446.29 rpm1400–1500 rpmNormal-0.04/hr
Motor Load58.46 %50–80 %Normal-0.11/hr
Pressure4.92 bar4–6 barNormal-0.05/hr
Flow96.27 % of rated88–112 % of ratedNormal-0.05/hr
Lubrication Condition89.59 % quality70–100 % qualityNormal+0.01/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Impeller Erosion / Cavitation cascade

Flow Deviates from Rated
Process Instability
Cavitation / Surge Risk Rises
Vibration Increases
Bearing Stress Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

BL-127 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-BL-127
Functional LocationTank Farm / Blower Area 2
ManufacturerSiemens Energy
Install Date2015-09-12
Runtime Hours35,520 hrs
Last Maintenance2026-03-27
Open Equipment Health record