Executive Dashboard
Deepkore Integrated Energy Complex · Coastal Refinery · Live operational cockpit
Overall Plant Health
Deepkore Integrated Energy Complex
13 assets below Attention threshold · 4 in Danger band
30-day trend
Health by Unit
Coastal Refinery · click any unit to drill down
CDU
1 critical · 10 assets
VDU
0 critical · 6 assets
Hydrocracker
4 critical · 17 assets
Hydrogen Plant
0 critical · 5 assets
Sulfur Recovery Unit
0 critical · 5 assets
Catalytic Reformer
1 critical · 6 assets
FCC Unit
2 critical · 9 assets
Utilities
3 critical · 9 assets
Tank Farm
1 critical · 6 assets
Offsites
1 critical · 9 assets
OEE
MTBF
MTTR
Maintenance Cost
Unplanned Avoided
Budget Utilization
Equipment Availability
Maintenance Compliance
Failure Prediction Trend
AI-predicted vs. actual failure events per month
Live Alerts
7 unacknowledged
High Vibration
CriticalGB-126 · Hydrocracker
High Temperature
HighM-116 · Utilities
Lubrication Failure
HighR-142 · Hydrocracker
Bearing Wear Signature
MediumK-168 · Utilities
Material Shortage
MediumE-146 · FCC Unit
Calibration Due
LowK-108 · FCC Unit
Technician Shortage
HighPL-177 · CDU
Equipment Health Heat Map
Every monitored asset, grouped by unit
AI Insights
Generated by the Agentic AI platform
Maintenance Recommendation Agent
Postpone maintenance on 6 assets
Sustained excellent health and low degradation trend allow safe interval extension without added risk.
Shutdown Planning Agent
Combine 3 jobs into Hydrocracker Turnaround
Wet Gas Compressor and 2 adjacent jobs can be executed within the same window, saving an estimated $180K in production loss.
Root Cause Analysis Agent
Wet Gas Compressor trending toward bearing failure
Vibration envelope and anomaly score both crossed threshold in the last 48 hours — RUL now 24 days.
Top 10 Critical Assets
Ranked by health score
| Tag | Unit | Health | RUL | Failure Prob. | Criticality |
|---|---|---|---|---|---|
| P-166 Pump P-166 | Offsites | 21% | 4d | 80% | Low |
| GB-126 Gear Box GB-126 | Hydrocracker | 35% | 48d | 66% | High |
| M-116 Instrument Air Compressor Motor | Utilities | 39% | 82d | 59% | Medium |
| R-142 Reactor R-142 | Hydrocracker | 39% | 102d | 61% | Low |
| K-168 Compressor K-168 | Utilities | 40% | 84d | 67% | Medium |
| E-146 Heat Exchanger E-146 | FCC Unit | 44% | 103d | 51% | Medium |
| K-108 Wet Gas Compressor | FCC Unit | 45% | 73d | 57% | High |
| PL-177 Pipeline PL-177 | CDU | 47% | 100d | 59% | High |
| G-134 Generator G-134 | Catalytic Reformer | 48% | 115d | 50% | Low |
| K-102 Make-up Gas Compressor | Hydrocracker | 54% | 115d | 42% | High |
Plant Risk Map
Failure likelihood × business impact
Upcoming Shutdowns
Planned, scheduled and in-progress shutdown programs
Hydrocracker Major Turnaround
Hydrocracker · 10 days · starts 2026-09-05
FCC Wet Gas Compressor Overhaul
FCC Unit · 5 days · starts 2026-08-24
CDU Preheat Train Inspection
CDU · 3 days · starts 2026-09-29
Sulfur Recovery Statutory Inspection
Sulfur Recovery Unit · 4 days · starts 2026-10-14