Pump P-143
Low CriticalityP-143 · Pump · Sulfur Recovery Unit / Pump Area 2 · Mfr. GE Vernova
Healthy
Failure Probability
19%
Anomaly Score
14
Remaining Useful Life
325 Days
RUL Confidence
80%
Health, Vibration & Temperature Trend
Trailing 30 days · sensor-fused signal
Remaining Useful Life
Generated by the Remaining Useful Life Agent
325
days
Remaining Days
7,800
hrs
Operating Hours
2,210
cycles
Remaining Cycles
80
%
Confidence
Likely failure mode: Seal Leakage
Maintenance Strategy Optimization
Current strategy: maintenance every 24 months
From
24mo
To
27mo
Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.
Asset Details
AI Recommendation
Maintenance Recommendation Agent
P-143 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.
Recommended Shutdown
Shutdown Planning Agent
Sulfur Recovery Statutory Inspection
Starts 2026-10-14 · 4 days
Recent Work Orders
WO-20450 · Vibration inspection
Closed · 2026-03-11
WO-20451 · Lubrication top-up
Closed · 2026-03-11
WO-20452 · Bearing replacement
Closed · 2026-03-11