Equipment HealthSulfur Recovery UnitP-143

Pump P-143

Low Criticality

P-143 · Pump · Sulfur Recovery Unit / Pump Area 2 · Mfr. GE Vernova

Health trend improving
89%

Healthy

Failure Probability

19%

Anomaly Score

14

Remaining Useful Life

325 Days

RUL Confidence

80%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

325

days

Remaining Days

7,800

hrs

Operating Hours

2,210

cycles

Remaining Cycles

80

%

Confidence

Likely failure mode: Seal Leakage

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

27mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-P-143
Functional LocationSulfur Recovery Unit / Pump Area 2
ManufacturerGE Vernova
Install Date2019-01-23
Runtime Hours34,701 hrs
Last Maintenance2026-03-11
Next Maintenance2027-03-30

AI Recommendation

Maintenance Recommendation Agent

P-143 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Sulfur Recovery Statutory Inspection

Starts 2026-10-14 · 4 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-03-11

WO-20451 · Lubrication top-up

Closed · 2026-03-11

WO-20452 · Bearing replacement

Closed · 2026-03-11