Pump P-143 — Digital Twin

Normal

P-143 · Pump · Sulfur Recovery Unit / Pump Area 2 · Running · Normal Load

Criticality: Low · Degradation: Normal

89%

Healthy

Failure Probability

19%

Remaining Useful Life

325 Days

Predicted Failure Mode

Seal Leakage

RUL Confidence

80%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

89%

Failure probability 19%

AI Predicted

Predicted · 325d horizon

85%

Seal Leakage trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.46 mm/s2–5 mm/sNormal-0.07/hr
Temperature48.14 °C40–70 °CNormal-0.19/hr
RPM1447.38 rpm1400–1500 rpmNormal-0.24/hr
Motor Load57.99 %50–80 %Normal-0.21/hr
Pressure4.78 bar4–6 barNormal-0.13/hr
Flow102.02 % of rated88–112 % of ratedNormal-0.02/hr
Lubrication Condition88.68 % quality70–100 % qualityNormal+0.07/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Seal Leakage cascade

Pressure Deviates from Setpoint
Seal Stress Increases
Leakage Risk Increases
Flow Instability
Cavitation / Surge Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

P-143 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-P-143
Functional LocationSulfur Recovery Unit / Pump Area 2
ManufacturerGE Vernova
Install Date2019-01-23
Runtime Hours34,701 hrs
Last Maintenance2026-03-11
Open Equipment Health record