Electrical Panel EP-122
Low CriticalityEP-122 · Electrical Panel · Hydrocracker / Electrical Panel Area 3 · Mfr. GE Vernova
Critical
Failure Probability
48%
Anomaly Score
37
Remaining Useful Life
166 Days
RUL Confidence
70%
Health, Vibration & Temperature Trend
Trailing 30 days · sensor-fused signal
Remaining Useful Life
Generated by the Remaining Useful Life Agent
166
days
Remaining Days
3,984
hrs
Operating Hours
803
cycles
Remaining Cycles
70
%
Confidence
Likely failure mode: Relay Fault
Maintenance Strategy Optimization
Current strategy: maintenance every 24 months
From
24mo
To
21mo
Accelerated degradation detected — vibration and anomaly score trending above baseline faster than model expectation.
Asset Details
AI Recommendation
Maintenance Recommendation Agent
EP-122 shows accelerating degradation. Recommend scoping into the next available shutdown window and pre-ordering relay fault spares.
Recommended Shutdown
Shutdown Planning Agent
Hydrocracker Major Turnaround
Starts 2026-09-05 · 10 days
Recent Work Orders
WO-20450 · Vibration inspection
Closed · 2026-04-17
WO-20451 · Lubrication top-up
Closed · 2026-04-17
WO-20452 · Bearing replacement
Closed · 2026-04-17