MU
Digital TwinHydrocrackerEP-122
Back

Electrical Panel EP-122 — Digital Twin

Degrading

EP-122 · Electrical Panel · Hydrocracker / Electrical Panel Area 3 · Running · Normal Load

Criticality: Low · Degradation: Accelerated Degradation

58%

Critical

Failure Probability

48%

Remaining Useful Life

166 Days

Predicted Failure Mode

Relay Fault

RUL Confidence

70%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

72%

Trailing sensor-fused health

Live

Current

58%

Failure probability 48%

AI Predicted

Predicted · 166d horizon

43%

Relay Fault trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration4.69 mm/s2–5 mm/sNormal+0.09/hr
Temperature56.43 °C40–70 °CNormal+0.26/hr
RPM1437.39 rpm1400–1500 rpmNormal+0.34/hr
Motor Load69.64 %50–80 %Normal+0.2/hr
Pressure4.58 bar4–6 barNormal+0.05/hr
Flow91.99 % of rated88–112 % of ratedNormal+0.09/hr
Lubrication Condition74.59 % quality70–100 % qualityNormal-0.01/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Relay Fault cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

EP-122 shows accelerated degradation. Recommend opening a What-If simulation to quantify the risk of continued operation and identify the optimal intervention window.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-EP-122
Functional LocationHydrocracker / Electrical Panel Area 3
ManufacturerGE Vernova
Install Date2022-03-12
Runtime Hours65,870 hrs
Last Maintenance2026-04-17
Open Equipment Health record