MU
Equipment HealthHydrocrackerFN-156

Fan FN-156

Medium Criticality

FN-156 · Fan · Hydrocracker / Fan Area 2 · Mfr. Ebara

Health trend improving
100%

Excellent

Failure Probability

1%

Anomaly Score

1

Remaining Useful Life

359 Days

RUL Confidence

84%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

359

days

Remaining Days

8,616

hrs

Operating Hours

1,105

cycles

Remaining Cycles

84

%

Confidence

Likely failure mode: Blade Imbalance

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

20mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-FN-156
Functional LocationHydrocracker / Fan Area 2
ManufacturerEbara
Install Date2023-06-07
Runtime Hours81,797 hrs
Last Maintenance2026-05-10
Next Maintenance2027-04-23

AI Recommendation

Maintenance Recommendation Agent

FN-156 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-05-10

WO-20451 · Lubrication top-up

Closed · 2026-05-10

WO-20452 · Bearing replacement

Closed · 2026-05-10