MU
Digital TwinHydrocrackerFN-156
Back

Fan FN-156 — Digital Twin

Healthy

FN-156 · Fan · Hydrocracker / Fan Area 2 · Running · Normal Load

Criticality: Medium · Degradation: Normal

100%

Excellent

Failure Probability

1%

Remaining Useful Life

359 Days

Predicted Failure Mode

Blade Imbalance

RUL Confidence

84%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

100%

Failure probability 1%

AI Predicted

Predicted · 359d horizon

100%

Blade Imbalance trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration1.77 mm/s2–5 mm/sWarning-0.14/hr
Temperature40.68 °C40–70 °CNormal-0.09/hr
RPM1440.92 rpm1400–1500 rpmNormal-0.02/hr
Motor Load55.39 %50–80 %Normal-0.05/hr
Pressure5.21 bar4–6 barNormal-0.2/hr
Flow100.68 % of rated88–112 % of ratedNormal-0.27/hr
Lubrication Condition94.7 % quality70–100 % qualityNormal+0.15/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Blade Imbalance cascade

Motor Load Increases
Winding Temperature Rises
Motor Insulation Stress Increases
Bearing Load Increases
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

FN-156 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-FN-156
Functional LocationHydrocracker / Fan Area 2
ManufacturerEbara
Install Date2023-06-07
Runtime Hours81,797 hrs
Last Maintenance2026-05-10
Open Equipment Health record