MU
Equipment HealthHydrocrackerR-106

Hydrocracking Reactor R-201

High Criticality

R-106 · Reactor · Hydrocracker / Reaction Section · Mfr. Ebara

Health trend stable
82%

Healthy

Failure Probability

16%

Anomaly Score

15

Remaining Useful Life

224 Days

RUL Confidence

77%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

224

days

Remaining Days

5,376

hrs

Operating Hours

1,806

cycles

Remaining Cycles

77

%

Confidence

Likely failure mode: Catalyst Deactivation

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

18mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-R-106
Functional LocationHydrocracker / Reaction Section
ManufacturerEbara
Install Date2018-12-29
Runtime Hours44,658 hrs
Last Maintenance2026-02-01
Next Maintenance2027-01-19

AI Recommendation

Maintenance Recommendation Agent

R-106 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-02-01

WO-20451 · Lubrication top-up

Closed · 2026-02-01

WO-20452 · Bearing replacement

Closed · 2026-02-01