Equipment HealthSulfur Recovery UnitBL-144

Blower BL-144

Low Criticality

BL-144 · Blower · Sulfur Recovery Unit / Blower Area 2 · Mfr. Weir Group

Health trend improving
94%

Healthy

Failure Probability

13%

Anomaly Score

3

Remaining Useful Life

352 Days

RUL Confidence

90%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

352

days

Remaining Days

8,448

hrs

Operating Hours

1,975

cycles

Remaining Cycles

90

%

Confidence

Likely failure mode: Impeller Imbalance

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

21mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-BL-144
Functional LocationSulfur Recovery Unit / Blower Area 2
ManufacturerWeir Group
Install Date2018-01-01
Runtime Hours12,789 hrs
Last Maintenance2026-01-21
Next Maintenance2027-04-18

AI Recommendation

Maintenance Recommendation Agent

BL-144 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Sulfur Recovery Statutory Inspection

Starts 2026-10-14 · 4 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-01-21

WO-20451 · Lubrication top-up

Closed · 2026-01-21

WO-20452 · Bearing replacement

Closed · 2026-01-21