Blower BL-144 — Digital Twin
HealthyBL-144 · Blower · Sulfur Recovery Unit / Blower Area 2 · Running · Normal Load
Criticality: Low · Degradation: Normal
Healthy
Failure Probability
13%
Remaining Useful Life
352 Days
Predicted Failure Mode
Impeller Imbalance
RUL Confidence
90%
Digital Twin State Timeline
Historical → Current → AI Predicted → What-If Simulated
30 Days Ago
100%
Trailing sensor-fused health
Current
94%
Failure probability 13%
Predicted · 352d horizon
92%
Impeller Imbalance trend
What-If
—
Run a simulation to project this
Live Equipment Visualization
Component-level condition · click a component to inspect
Click a component to inspect its condition, sensor signals and simulate a component-level failure.
Live Sensor Panel
PLC / DCS / SCADA / IoT tags mapped to this asset
| Parameter | Current | Normal Range | Status | Trend |
|---|---|---|---|---|
| Vibration | 2.18 mm/s | 2–5 mm/s | Normal | -0.33/hr |
| Temperature | 43.25 °C | 40–70 °C | Normal | -0.17/hr |
| RPM | 1441.58 rpm | 1400–1500 rpm | Normal | -0.25/hr |
| Motor Load | 58.31 % | 50–80 % | Normal | -0.09/hr |
| Pressure | 4.91 bar | 4–6 bar | Normal | -0.15/hr |
| Flow | 103.41 % of rated | 88–112 % of rated | Normal | -0.04/hr |
| Lubrication Condition | 93.06 % quality | 70–100 % quality | Normal | +0.14/hr |
Vibration · 24h history
Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/sFailure Propagation Preview
Most probable cascade given current condition · full analysis available in What-If Simulation
Impeller Imbalance cascade
AI Recommendation
Maintenance Recommendation Agent
BL-144 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.
Scenario History
Loading…
No simulations saved yet for this asset.