MU
Equipment HealthHydrocrackerBR-150

Bearing BR-150

Medium Criticality

BR-150 · Bearing · Hydrocracker / Bearing Area 4 · Mfr. Siemens Energy

Health trend improving
97%

Excellent

Failure Probability

3%

Anomaly Score

3

Remaining Useful Life

369 Days

RUL Confidence

94%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

369

days

Remaining Days

8,856

hrs

Operating Hours

2,796

cycles

Remaining Cycles

94

%

Confidence

Likely failure mode: Overheating

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

38mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-BR-150
Functional LocationHydrocracker / Bearing Area 4
ManufacturerSiemens Energy
Install Date2023-04-19
Runtime Hours84,506 hrs
Last Maintenance2025-11-01
Next Maintenance2027-04-30

AI Recommendation

Maintenance Recommendation Agent

BR-150 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-01

WO-20451 · Lubrication top-up

Closed · 2025-11-01

WO-20452 · Bearing replacement

Closed · 2025-11-01