MU
Digital TwinHydrocrackerBR-150
Back

Bearing BR-150 — Digital Twin

Healthy

BR-150 · Bearing · Hydrocracker / Bearing Area 4 · Running · Reduced Load

Criticality: Medium · Degradation: Normal

97%

Excellent

Failure Probability

3%

Remaining Useful Life

369 Days

Predicted Failure Mode

Overheating

RUL Confidence

94%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

97%

Failure probability 3%

AI Predicted

Predicted · 369d horizon

96%

Overheating trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.16 mm/s2–5 mm/sNormal-0.14/hr
Temperature45.01 °C40–70 °CNormal-0.07/hr
RPM1440.72 rpm1400–1500 rpmNormal-0.1/hr
Motor Load52.19 %50–80 %Normal-0.23/hr
Pressure5.13 bar4–6 barNormal-0.29/hr
Flow103.53 % of rated88–112 % of ratedNormal-0.18/hr
Lubrication Condition92.66 % quality70–100 % qualityNormal+0.15/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Overheating cascade

Lubrication Condition Deteriorates
Friction Increases
Bearing Temperature Rises
Wear Rate Accelerates
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

BR-150 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-BR-150
Functional LocationHydrocracker / Bearing Area 4
ManufacturerSiemens Energy
Install Date2023-04-19
Runtime Hours84,506 hrs
Last Maintenance2025-11-01
Open Equipment Health record