MU
Equipment HealthCatalytic ReformerF-165

Furnace F-165

Low Criticality

F-165 · Furnace · Catalytic Reformer / Furnace Area 3 · Mfr. GE Vernova

Health trend improving
100%

Excellent

Failure Probability

1%

Anomaly Score

1

Remaining Useful Life

357 Days

RUL Confidence

84%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

357

days

Remaining Days

8,568

hrs

Operating Hours

1,138

cycles

Remaining Cycles

84

%

Confidence

Likely failure mode: Tube Coking

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

27mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-165
Functional LocationCatalytic Reformer / Furnace Area 3
ManufacturerGE Vernova
Install Date2023-07-25
Runtime Hours18,287 hrs
Last Maintenance2026-06-13
Next Maintenance2027-04-22

AI Recommendation

Maintenance Recommendation Agent

F-165 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-06-13

WO-20451 · Lubrication top-up

Closed · 2026-06-13

WO-20452 · Bearing replacement

Closed · 2026-06-13