MU
Digital TwinCatalytic ReformerF-165
Back

Furnace F-165 — Digital Twin

Healthy

F-165 · Furnace · Catalytic Reformer / Furnace Area 3 · Running · Reduced Load

Criticality: Low · Degradation: Normal

100%

Excellent

Failure Probability

1%

Remaining Useful Life

357 Days

Predicted Failure Mode

Tube Coking

RUL Confidence

84%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

100%

Failure probability 1%

AI Predicted

Predicted · 357d horizon

100%

Tube Coking trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.26 mm/s2–5 mm/sNormal-0.21/hr
Temperature41.86 °C40–70 °CNormal-0.34/hr
RPM1454.25 rpm1400–1500 rpmNormal-0.24/hr
Motor Load52.91 %50–80 %Normal-0.09/hr
Pressure4.79 bar4–6 barNormal-0.02/hr
Flow101.7 % of rated88–112 % of ratedNormal-0.02/hr
Lubrication Condition93.1 % quality70–100 % qualityNormal+0.11/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Tube Coking cascade

Pressure Deviates from Setpoint
Seal Stress Increases
Leakage Risk Increases
Flow Instability
Cavitation / Surge Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

F-165 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-F-165
Functional LocationCatalytic Reformer / Furnace Area 3
ManufacturerGE Vernova
Install Date2023-07-25
Runtime Hours18,287 hrs
Last Maintenance2026-06-13
Open Equipment Health record