MU
Equipment HealthFCC UnitE-146

Heat Exchanger E-146

Medium Criticality

E-146 · Heat Exchanger · FCC Unit / Heat Exchanger Area 3 · Mfr. Weir Group

Health trend declining
44%

Critical

Failure Probability

51%

Anomaly Score

42

Remaining Useful Life

103 Days

RUL Confidence

63%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

103

days

Remaining Days

2,472

hrs

Operating Hours

899

cycles

Remaining Cycles

63

%

Confidence

Likely failure mode: Tube Leakage

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

30mo

Advance Schedule

Accelerated degradation detected — vibration and anomaly score trending above baseline faster than model expectation.

Asset Details

Equipment IDEQ-E-146
Functional LocationFCC Unit / Heat Exchanger Area 3
ManufacturerWeir Group
Install Date2022-12-20
Runtime Hours36,241 hrs
Last Maintenance2026-02-11
Next Maintenance2026-10-26

AI Recommendation

Maintenance Recommendation Agent

E-146 shows accelerating degradation. Recommend scoping into the next available shutdown window and pre-ordering tube leakage spares.

Recommended Shutdown

Shutdown Planning Agent

FCC Wet Gas Compressor Overhaul

Starts 2026-08-24 · 5 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-02-11

WO-20451 · Lubrication top-up

Closed · 2026-02-11

WO-20452 · Bearing replacement

Closed · 2026-02-11