Heat Exchanger E-146 — Digital Twin

Degrading

E-146 · Heat Exchanger · FCC Unit / Heat Exchanger Area 3 · Running · Normal Load

Criticality: Medium · Degradation: Accelerated Degradation

44%

Critical

Failure Probability

51%

Remaining Useful Life

103 Days

Predicted Failure Mode

Tube Leakage

RUL Confidence

63%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

52%

Trailing sensor-fused health

Live

Current

44%

Failure probability 51%

AI Predicted

Predicted · 103d horizon

24%

Tube Leakage trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration5.33 mm/s2–5 mm/sWarning+0.01/hr
Temperature63.25 °C40–70 °CNormal+0.02/hr
RPM1429.68 rpm1400–1500 rpmNormal+0.29/hr
Motor Load77.88 %50–80 %Normal+0.22/hr
Pressure4.24 bar4–6 barNormal+0.33/hr
Flow92.27 % of rated88–112 % of ratedNormal+0.11/hr
Lubrication Condition66.29 % quality70–100 % qualityWarning-0.1/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Tube Leakage cascade

Pressure Deviates from Setpoint
Seal Stress Increases
Leakage Risk Increases
Flow Instability
Cavitation / Surge Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

E-146 shows accelerated degradation. Recommend opening a What-If simulation to quantify the risk of continued operation and identify the optimal intervention window.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-E-146
Functional LocationFCC Unit / Heat Exchanger Area 3
ManufacturerWeir Group
Install Date2022-12-20
Runtime Hours36,241 hrs
Last Maintenance2026-02-11