MU
Equipment HealthCatalytic ReformerR-110

Reformer Reactor R-301

High Criticality

R-110 · Reactor · Catalytic Reformer / Reaction Section · Mfr. Emerson

Health trend stable
85%

Healthy

Failure Probability

17%

Anomaly Score

9

Remaining Useful Life

235 Days

RUL Confidence

83%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

235

days

Remaining Days

5,640

hrs

Operating Hours

1,742

cycles

Remaining Cycles

83

%

Confidence

Likely failure mode: Thermal Cycling Fatigue

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

36mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-R-110
Functional LocationCatalytic Reformer / Reaction Section
ManufacturerEmerson
Install Date2023-11-24
Runtime Hours31,859 hrs
Last Maintenance2026-07-21
Next Maintenance2027-01-27

AI Recommendation

Maintenance Recommendation Agent

R-110 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-07-21

WO-20451 · Lubrication top-up

Closed · 2026-07-21

WO-20452 · Bearing replacement

Closed · 2026-07-21