MU
Digital TwinCatalytic ReformerR-110
Back

Reformer Reactor R-301 — Digital Twin

Normal

R-110 · Reactor · Catalytic Reformer / Reaction Section · Running · Normal Load

Criticality: High · Degradation: Normal

85%

Healthy

Failure Probability

17%

Remaining Useful Life

235 Days

Predicted Failure Mode

Thermal Cycling Fatigue

RUL Confidence

83%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

99%

Trailing sensor-fused health

Live

Current

85%

Failure probability 17%

AI Predicted

Predicted · 235d horizon

80%

Thermal Cycling Fatigue trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.8 mm/s2–5 mm/sNormal0/hr
Temperature49.72 °C40–70 °CNormal0/hr
RPM1444.15 rpm1400–1500 rpmNormal0/hr
Motor Load57.69 %50–80 %Normal0/hr
Pressure4.8 bar4–6 barNormal0/hr
Flow96.86 % of rated88–112 % of ratedNormal0/hr
Lubrication Condition90.63 % quality70–100 % qualityNormal0/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Thermal Cycling Fatigue cascade

Pressure Deviates from Setpoint
Seal Stress Increases
Leakage Risk Increases
Flow Instability
Cavitation / Surge Risk Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

R-110 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-R-110
Functional LocationCatalytic Reformer / Reaction Section
ManufacturerEmerson
Install Date2023-11-24
Runtime Hours31,859 hrs
Last Maintenance2026-07-21
Open Equipment Health record