MU
Equipment HealthTank FarmP-113

Product Transfer Pump

Medium Criticality

P-113 · Pump · Tank Farm / Product Transfer · Mfr. Weir Group

Health trend declining
58%

Critical

Failure Probability

37%

Anomaly Score

43

Remaining Useful Life

184 Days

RUL Confidence

76%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

184

days

Remaining Days

4,416

hrs

Operating Hours

1,471

cycles

Remaining Cycles

76

%

Confidence

Likely failure mode: Seal Leakage

Maintenance Strategy Optimization

Current strategy: maintenance every 12 months

From

12mo

To

9mo

Advance Schedule

Accelerated degradation detected — vibration and anomaly score trending above baseline faster than model expectation.

Asset Details

Equipment IDEQ-P-113
Functional LocationTank Farm / Product Transfer
ManufacturerWeir Group
Install Date2024-01-05
Runtime Hours45,270 hrs
Last Maintenance2025-11-18
Next Maintenance2026-12-22

AI Recommendation

Maintenance Recommendation Agent

P-113 shows accelerating degradation. Recommend scoping into the next available shutdown window and pre-ordering seal leakage spares.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-18

WO-20451 · Lubrication top-up

Closed · 2025-11-18

WO-20452 · Bearing replacement

Closed · 2025-11-18