MU
Digital TwinTank FarmP-113
Back

Product Transfer Pump — Digital Twin

Degrading

P-113 · Pump · Tank Farm / Product Transfer · Running · Normal Load

Criticality: Medium · Degradation: Accelerated Degradation

58%

Critical

Failure Probability

37%

Remaining Useful Life

184 Days

Predicted Failure Mode

Seal Leakage

RUL Confidence

76%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

70%

Trailing sensor-fused health

Live

Current

58%

Failure probability 37%

AI Predicted

Predicted · 184d horizon

43%

Seal Leakage trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration4.5 mm/s2–5 mm/sNormal+0.3/hr
Temperature59.3 °C40–70 °CNormal+0.03/hr
RPM1418.85 rpm1400–1500 rpmNormal+0.06/hr
Motor Load71.76 %50–80 %Normal+0.34/hr
Pressure4.12 bar4–6 barNormal+0.14/hr
Flow89.17 % of rated88–112 % of ratedNormal+0.26/hr
Lubrication Condition77.32 % quality70–100 % qualityNormal-0.1/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Seal Leakage cascade

Motor Load Increases
Winding Temperature Rises
Motor Insulation Stress Increases
Bearing Load Increases
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

P-113 shows accelerated degradation. Recommend opening a What-If simulation to quantify the risk of continued operation and identify the optimal intervention window.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-P-113
Functional LocationTank Farm / Product Transfer
ManufacturerWeir Group
Install Date2024-01-05
Runtime Hours45,270 hrs
Last Maintenance2025-11-18
Open Equipment Health record