Equipment HealthOffsitesP-166

Pump P-166

Low Criticality

P-166 · Pump · Offsites / Pump Area 3 · Mfr. Flowserve

Health trend declining
21%

Danger

Failure Probability

80%

Anomaly Score

60

Remaining Useful Life

4 Days

RUL Confidence

65%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

4

days

Remaining Days

96

hrs

Operating Hours

33

cycles

Remaining Cycles

65

%

Confidence

Likely failure mode: Cavitation

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

18mo

Advance Schedule

Accelerated degradation detected — vibration and anomaly score trending above baseline faster than model expectation.

Asset Details

Equipment IDEQ-P-166
Functional LocationOffsites / Pump Area 3
ManufacturerFlowserve
Install Date2020-12-22
Runtime Hours15,187 hrs
Last Maintenance2026-02-27
Next Maintenance2026-08-18

AI Recommendation

Maintenance Recommendation Agent

P-166 shows accelerating degradation. Recommend scoping into the next available shutdown window and pre-ordering cavitation spares.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-02-27

WO-20451 · Lubrication top-up

Closed · 2026-02-27

WO-20452 · Bearing replacement

Closed · 2026-02-27