MU
Digital TwinOffsitesP-166
Back

Pump P-166 — Digital Twin

Predicted Failure

P-166 · Pump · Offsites / Pump Area 3 · Running · Degraded · High Load

Criticality: Low · Degradation: Critical Degradation

21%

Danger

Failure Probability

80%

Remaining Useful Life

4 Days

Predicted Failure Mode

Cavitation

RUL Confidence

65%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

29%

Trailing sensor-fused health

Live

Current

21%

Failure probability 80%

AI Predicted

Predicted · 4d horizon

5%

Cavitation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration6.44 mm/s2–5 mm/sWarning+0.21/hr
Temperature74.82 °C40–70 °CWarning+0.09/hr
RPM1401.11 rpm1400–1500 rpmNormal+0.1/hr
Motor Load85.56 %50–80 %Warning+0.06/hr
Pressure3.94 bar4–6 barWarning+0.07/hr
Flow80.75 % of rated88–112 % of ratedWarning+0.2/hr
Lubrication Condition55.04 % quality70–100 % qualityWarning-0.1/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Cavitation cascade

Motor Load Increases
Winding Temperature Rises
Motor Insulation Stress Increases
Bearing Load Increases
Vibration Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

P-166 shows critical degradation. Recommend opening a What-If simulation to quantify the risk of continued operation and identify the optimal intervention window.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-P-166
Functional LocationOffsites / Pump Area 3
ManufacturerFlowserve
Install Date2020-12-22
Runtime Hours15,187 hrs
Last Maintenance2026-02-27
Open Equipment Health record