Furnace F-145
High CriticalityF-145 · Furnace · CDU / Furnace Area 3 · Mfr. Ebara
Excellent
Failure Probability
10%
Anomaly Score
6
Remaining Useful Life
249 Days
RUL Confidence
85%
Health, Vibration & Temperature Trend
Trailing 30 days · sensor-fused signal
Remaining Useful Life
Generated by the Remaining Useful Life Agent
249
days
Remaining Days
5,976
hrs
Operating Hours
866
cycles
Remaining Cycles
85
%
Confidence
Likely failure mode: Refractory Degradation
Maintenance Strategy Optimization
Current strategy: maintenance every 6 months
From
6mo
To
10mo
Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.
Asset Details
AI Recommendation
Maintenance Recommendation Agent
F-145 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.
Recommended Shutdown
Shutdown Planning Agent
CDU Preheat Train Inspection
Starts 2026-09-29 · 3 days
Recent Work Orders
WO-20450 · Vibration inspection
Closed · 2026-07-13
WO-20451 · Lubrication top-up
Closed · 2026-07-13
WO-20452 · Bearing replacement
Closed · 2026-07-13