Furnace F-145

High Criticality

F-145 · Furnace · CDU / Furnace Area 3 · Mfr. Ebara

Health trend improving
97%

Excellent

Failure Probability

10%

Anomaly Score

6

Remaining Useful Life

249 Days

RUL Confidence

85%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

249

days

Remaining Days

5,976

hrs

Operating Hours

866

cycles

Remaining Cycles

85

%

Confidence

Likely failure mode: Refractory Degradation

Maintenance Strategy Optimization

Current strategy: maintenance every 6 months

From

6mo

To

10mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-145
Functional LocationCDU / Furnace Area 3
ManufacturerEbara
Install Date2022-07-01
Runtime Hours22,503 hrs
Last Maintenance2026-07-13
Next Maintenance2027-02-05

AI Recommendation

Maintenance Recommendation Agent

F-145 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

CDU Preheat Train Inspection

Starts 2026-09-29 · 3 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-07-13

WO-20451 · Lubrication top-up

Closed · 2026-07-13

WO-20452 · Bearing replacement

Closed · 2026-07-13