MU
Digital TwinCDUF-145
Back

Furnace F-145 — Digital Twin

Healthy

F-145 · Furnace · CDU / Furnace Area 3 · Running · Normal Load

Criticality: High · Degradation: Normal

97%

Excellent

Failure Probability

10%

Remaining Useful Life

249 Days

Predicted Failure Mode

Refractory Degradation

RUL Confidence

85%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

97%

Failure probability 10%

AI Predicted

Predicted · 249d horizon

96%

Refractory Degradation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration1.89 mm/s2–5 mm/sWarning-0.15/hr
Temperature45.14 °C40–70 °CNormal-0.08/hr
RPM1449.07 rpm1400–1500 rpmNormal-0.33/hr
Motor Load59.47 %50–80 %Normal-0.08/hr
Pressure5.19 bar4–6 barNormal-0.27/hr
Flow99.16 % of rated88–112 % of ratedNormal-0.22/hr
Lubrication Condition93 % quality70–100 % qualityNormal+0.04/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Refractory Degradation cascade

Temperature Rises
Lubrication Film Breakdown Risk
Bearing Wear Accelerates
Friction & Vibration Increase
Motor Insulation Stress Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

F-145 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-F-145
Functional LocationCDU / Furnace Area 3
ManufacturerEbara
Install Date2022-07-01
Runtime Hours22,503 hrs
Last Maintenance2026-07-13
Open Equipment Health record