MU
Equipment HealthFCC UnitBR-136

Bearing BR-136

High Criticality

BR-136 · Bearing · FCC Unit / Bearing Area 1 · Mfr. Siemens Energy

Health trend improving
91%

Healthy

Failure Probability

12%

Anomaly Score

11

Remaining Useful Life

253 Days

RUL Confidence

92%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

253

days

Remaining Days

6,072

hrs

Operating Hours

1,927

cycles

Remaining Cycles

92

%

Confidence

Likely failure mode: Lubrication Breakdown

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

28mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-BR-136
Functional LocationFCC Unit / Bearing Area 1
ManufacturerSiemens Energy
Install Date2023-04-20
Runtime Hours30,262 hrs
Last Maintenance2025-12-17
Next Maintenance2027-02-08

AI Recommendation

Maintenance Recommendation Agent

BR-136 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

FCC Wet Gas Compressor Overhaul

Starts 2026-08-24 · 5 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-12-17

WO-20451 · Lubrication top-up

Closed · 2025-12-17

WO-20452 · Bearing replacement

Closed · 2025-12-17