MU
Digital TwinFCC UnitBR-136
Back

Bearing BR-136 — Digital Twin

Normal

BR-136 · Bearing · FCC Unit / Bearing Area 1 · Running · Normal Load

Criticality: High · Degradation: Normal

91%

Healthy

Failure Probability

12%

Remaining Useful Life

253 Days

Predicted Failure Mode

Lubrication Breakdown

RUL Confidence

92%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

91%

Failure probability 12%

AI Predicted

Predicted · 253d horizon

88%

Lubrication Breakdown trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.54 mm/s2–5 mm/sNormal-0.03/hr
Temperature47.19 °C40–70 °CNormal-0.11/hr
RPM1451.03 rpm1400–1500 rpmNormal-0.13/hr
Motor Load55.88 %50–80 %Normal-0.25/hr
Pressure4.91 bar4–6 barNormal-0.07/hr
Flow101.11 % of rated88–112 % of ratedNormal-0.27/hr
Lubrication Condition94.93 % quality70–100 % qualityNormal+0.06/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Lubrication Breakdown cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

BR-136 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-BR-136
Functional LocationFCC Unit / Bearing Area 1
ManufacturerSiemens Energy
Install Date2023-04-20
Runtime Hours30,262 hrs
Last Maintenance2025-12-17
Open Equipment Health record