MU
Equipment HealthHydrogen PlantE-147

Heat Exchanger E-147

Low Criticality

E-147 · Heat Exchanger · Hydrogen Plant / Heat Exchanger Area 1 · Mfr. Sulzer

Health trend improving
86%

Healthy

Failure Probability

8%

Anomaly Score

15

Remaining Useful Life

300 Days

RUL Confidence

79%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

300

days

Remaining Days

7,200

hrs

Operating Hours

1,060

cycles

Remaining Cycles

79

%

Confidence

Likely failure mode: Tube Fouling

Maintenance Strategy Optimization

Current strategy: maintenance every 12 months

From

12mo

To

12mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-E-147
Functional LocationHydrogen Plant / Heat Exchanger Area 1
ManufacturerSulzer
Install Date2018-09-09
Runtime Hours50,470 hrs
Last Maintenance2026-06-07
Next Maintenance2027-03-13

AI Recommendation

Maintenance Recommendation Agent

E-147 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-06-07

WO-20451 · Lubrication top-up

Closed · 2026-06-07

WO-20452 · Bearing replacement

Closed · 2026-06-07