MU
Equipment HealthTank FarmEP-170

Electrical Panel EP-170

High Criticality

EP-170 · Electrical Panel · Tank Farm / Electrical Panel Area 4 · Mfr. Ebara

Health trend improving
99%

Excellent

Failure Probability

7%

Anomaly Score

1

Remaining Useful Life

260 Days

RUL Confidence

84%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

260

days

Remaining Days

6,240

hrs

Operating Hours

1,251

cycles

Remaining Cycles

84

%

Confidence

Likely failure mode: Contact Overheating

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

40mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-EP-170
Functional LocationTank Farm / Electrical Panel Area 4
ManufacturerEbara
Install Date2016-08-17
Runtime Hours90,421 hrs
Last Maintenance2026-05-06
Next Maintenance2027-02-13

AI Recommendation

Maintenance Recommendation Agent

EP-170 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-05-06

WO-20451 · Lubrication top-up

Closed · 2026-05-06

WO-20452 · Bearing replacement

Closed · 2026-05-06