Electrical Panel EP-170 — Digital Twin

Healthy

EP-170 · Electrical Panel · Tank Farm / Electrical Panel Area 4 · Running · Reduced Load

Criticality: High · Degradation: Normal

99%

Excellent

Failure Probability

7%

Remaining Useful Life

260 Days

Predicted Failure Mode

Contact Overheating

RUL Confidence

84%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

99%

Failure probability 7%

AI Predicted

Predicted · 260d horizon

99%

Contact Overheating trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.17 mm/s2–5 mm/sNormal-0.21/hr
Temperature44.77 °C40–70 °CNormal-0.03/hr
RPM1444.43 rpm1400–1500 rpmNormal-0.07/hr
Motor Load52.27 %50–80 %Normal-0.17/hr
Pressure5.28 bar4–6 barNormal-0.03/hr
Flow103.99 % of rated88–112 % of ratedNormal-0.11/hr
Lubrication Condition94.48 % quality70–100 % qualityNormal+0.04/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Contact Overheating cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

EP-170 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-EP-170
Functional LocationTank Farm / Electrical Panel Area 4
ManufacturerEbara
Install Date2016-08-17
Runtime Hours90,421 hrs
Last Maintenance2026-05-06
Open Equipment Health record