Equipment HealthSulfur Recovery UnitV-112

Claus Reaction Furnace Vessel

Medium Criticality

V-112 · Vessel · Sulfur Recovery Unit / Claus Section · Mfr. KSB

Health trend improving
96%

Excellent

Failure Probability

13%

Anomaly Score

1

Remaining Useful Life

341 Days

RUL Confidence

79%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

341

days

Remaining Days

8,184

hrs

Operating Hours

1,222

cycles

Remaining Cycles

79

%

Confidence

Likely failure mode: Wall Thinning

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

22mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-V-112
Functional LocationSulfur Recovery Unit / Claus Section
ManufacturerKSB
Install Date2017-10-17
Runtime Hours45,286 hrs
Last Maintenance2026-05-19
Next Maintenance2027-04-11

AI Recommendation

Maintenance Recommendation Agent

V-112 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Sulfur Recovery Statutory Inspection

Starts 2026-10-14 · 4 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-05-19

WO-20451 · Lubrication top-up

Closed · 2026-05-19

WO-20452 · Bearing replacement

Closed · 2026-05-19