MU
Equipment HealthTank FarmF-158

Furnace F-158

High Criticality

F-158 · Furnace · Tank Farm / Furnace Area 3 · Mfr. Elliott Group

Health trend improving
96%

Excellent

Failure Probability

11%

Anomaly Score

3

Remaining Useful Life

271 Days

RUL Confidence

88%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

271

days

Remaining Days

6,504

hrs

Operating Hours

1,846

cycles

Remaining Cycles

88

%

Confidence

Likely failure mode: Tube Coking

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

20mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-158
Functional LocationTank Farm / Furnace Area 3
ManufacturerElliott Group
Install Date2024-03-24
Runtime Hours51,549 hrs
Last Maintenance2025-11-18
Next Maintenance2027-02-21

AI Recommendation

Maintenance Recommendation Agent

F-158 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-18

WO-20451 · Lubrication top-up

Closed · 2025-11-18

WO-20452 · Bearing replacement

Closed · 2025-11-18