MU
Digital TwinTank FarmF-158
Back

Furnace F-158 — Digital Twin

Healthy

F-158 · Furnace · Tank Farm / Furnace Area 3 · Running · Reduced Load

Criticality: High · Degradation: Normal

96%

Excellent

Failure Probability

11%

Remaining Useful Life

271 Days

Predicted Failure Mode

Tube Coking

RUL Confidence

88%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

96%

Failure probability 11%

AI Predicted

Predicted · 271d horizon

95%

Tube Coking trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.37 mm/s2–5 mm/sNormal-0.22/hr
Temperature40.72 °C40–70 °CNormal-0.02/hr
RPM1454.55 rpm1400–1500 rpmNormal-0.28/hr
Motor Load53.87 %50–80 %Normal-0.21/hr
Pressure4.8 bar4–6 barNormal-0.24/hr
Flow97.23 % of rated88–112 % of ratedNormal-0.25/hr
Lubrication Condition96.01 % quality70–100 % qualityNormal+0.07/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Tube Coking cascade

Temperature Rises
Lubrication Film Breakdown Risk
Bearing Wear Accelerates
Friction & Vibration Increase
Motor Insulation Stress Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

F-158 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-F-158
Functional LocationTank Farm / Furnace Area 3
ManufacturerElliott Group
Install Date2024-03-24
Runtime Hours51,549 hrs
Last Maintenance2025-11-18
Open Equipment Health record