MU
Equipment HealthTank FarmE-163

Heat Exchanger E-163

High Criticality

E-163 · Heat Exchanger · Tank Farm / Heat Exchanger Area 1 · Mfr. Ebara

Health trend improving
99%

Excellent

Failure Probability

1%

Anomaly Score

1

Remaining Useful Life

265 Days

RUL Confidence

79%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

265

days

Remaining Days

6,360

hrs

Operating Hours

1,355

cycles

Remaining Cycles

79

%

Confidence

Likely failure mode: Tube Leakage

Maintenance Strategy Optimization

Current strategy: maintenance every 6 months

From

6mo

To

9mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-E-163
Functional LocationTank Farm / Heat Exchanger Area 1
ManufacturerEbara
Install Date2017-05-29
Runtime Hours45,840 hrs
Last Maintenance2025-11-12
Next Maintenance2027-02-17

AI Recommendation

Maintenance Recommendation Agent

E-163 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-12

WO-20451 · Lubrication top-up

Closed · 2025-11-12

WO-20452 · Bearing replacement

Closed · 2025-11-12