Column C-121
Low CriticalityC-121 · Column · FCC Unit / Column Area 4 · Mfr. GE Vernova
Healthy
Failure Probability
6%
Anomaly Score
11
Remaining Useful Life
346 Days
RUL Confidence
88%
Health, Vibration & Temperature Trend
Trailing 30 days · sensor-fused signal
Remaining Useful Life
Generated by the Remaining Useful Life Agent
346
days
Remaining Days
8,304
hrs
Operating Hours
1,967
cycles
Remaining Cycles
88
%
Confidence
Likely failure mode: Tray Fouling
Maintenance Strategy Optimization
Current strategy: maintenance every 24 months
From
24mo
To
26mo
Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.
Asset Details
AI Recommendation
Maintenance Recommendation Agent
C-121 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.
Recommended Shutdown
Shutdown Planning Agent
FCC Wet Gas Compressor Overhaul
Starts 2026-08-24 · 5 days
Recent Work Orders
WO-20450 · Vibration inspection
Closed · 2026-03-24
WO-20451 · Lubrication top-up
Closed · 2026-03-24
WO-20452 · Bearing replacement
Closed · 2026-03-24