MU

Main Fractionation Column

High Criticality

C-105 · Column · CDU / Fractionation · Mfr. Siemens Energy

Health trend improving
93%

Healthy

Failure Probability

2%

Anomaly Score

4

Remaining Useful Life

246 Days

RUL Confidence

87%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

246

days

Remaining Days

5,904

hrs

Operating Hours

1,362

cycles

Remaining Cycles

87

%

Confidence

Likely failure mode: Corrosion

Maintenance Strategy Optimization

Current strategy: maintenance every 6 months

From

6mo

To

10mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-C-105
Functional LocationCDU / Fractionation
ManufacturerSiemens Energy
Install Date2023-11-27
Runtime Hours19,901 hrs
Last Maintenance2026-06-27
Next Maintenance2027-02-03

AI Recommendation

Maintenance Recommendation Agent

C-105 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

CDU Preheat Train Inspection

Starts 2026-09-29 · 3 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-06-27

WO-20451 · Lubrication top-up

Closed · 2026-06-27

WO-20452 · Bearing replacement

Closed · 2026-06-27