MU
Equipment HealthUtilitiesEP-175

Electrical Panel EP-175

Low Criticality

EP-175 · Electrical Panel · Utilities / Electrical Panel Area 1 · Mfr. Sulzer

Health trend improving
92%

Healthy

Failure Probability

9%

Anomaly Score

11

Remaining Useful Life

322 Days

RUL Confidence

84%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

322

days

Remaining Days

7,728

hrs

Operating Hours

2,032

cycles

Remaining Cycles

84

%

Confidence

Likely failure mode: Contact Overheating

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

20mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-EP-175
Functional LocationUtilities / Electrical Panel Area 1
ManufacturerSulzer
Install Date2020-01-27
Runtime Hours18,796 hrs
Last Maintenance2025-12-03
Next Maintenance2027-03-28

AI Recommendation

Maintenance Recommendation Agent

EP-175 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Utilities Boiler Emergency Repair

Starts 2026-08-09 · 2 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-12-03

WO-20451 · Lubrication top-up

Closed · 2025-12-03

WO-20452 · Bearing replacement

Closed · 2025-12-03