MU
Digital TwinUtilitiesEP-175
Back

Electrical Panel EP-175 — Digital Twin

Healthy

EP-175 · Electrical Panel · Utilities / Electrical Panel Area 1 · Running · Normal Load

Criticality: Low · Degradation: Normal

92%

Healthy

Failure Probability

9%

Remaining Useful Life

322 Days

Predicted Failure Mode

Contact Overheating

RUL Confidence

84%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

98%

Trailing sensor-fused health

Live

Current

92%

Failure probability 9%

AI Predicted

Predicted · 322d horizon

89%

Contact Overheating trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration2.46 mm/s2–5 mm/sNormal-0.12/hr
Temperature42.75 °C40–70 °CNormal-0.32/hr
RPM1437.72 rpm1400–1500 rpmNormal-0.35/hr
Motor Load60.64 %50–80 %Normal-0.33/hr
Pressure5.08 bar4–6 barNormal-0.21/hr
Flow100.29 % of rated88–112 % of ratedNormal-0.22/hr
Lubrication Condition96.14 % quality70–100 % qualityNormal+0.05/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Contact Overheating cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

EP-175 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-EP-175
Functional LocationUtilities / Electrical Panel Area 1
ManufacturerSulzer
Install Date2020-01-27
Runtime Hours18,796 hrs
Last Maintenance2025-12-03
Open Equipment Health record