MU
Equipment HealthSulfur Recovery UnitCV-176

Control Valve CV-176

Low Criticality

CV-176 · Control Valve · Sulfur Recovery Unit / Control Valve Area 2 · Mfr. Sulzer

Health trend improving
97%

Excellent

Failure Probability

2%

Anomaly Score

7

Remaining Useful Life

340 Days

RUL Confidence

81%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

340

days

Remaining Days

8,160

hrs

Operating Hours

1,923

cycles

Remaining Cycles

81

%

Confidence

Likely failure mode: Actuator Drift

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

26mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-CV-176
Functional LocationSulfur Recovery Unit / Control Valve Area 2
ManufacturerSulzer
Install Date2023-12-06
Runtime Hours25,676 hrs
Last Maintenance2025-12-29
Next Maintenance2027-04-10

AI Recommendation

Maintenance Recommendation Agent

CV-176 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Sulfur Recovery Statutory Inspection

Starts 2026-10-14 · 4 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-12-29

WO-20451 · Lubrication top-up

Closed · 2025-12-29

WO-20452 · Bearing replacement

Closed · 2025-12-29