MU
Equipment HealthHydrogen PlantPL-132

Pipeline PL-132

Low Criticality

PL-132 · Pipeline · Hydrogen Plant / Pipeline Area 4 · Mfr. Sulzer

Health trend improving
97%

Excellent

Failure Probability

1%

Anomaly Score

1

Remaining Useful Life

341 Days

RUL Confidence

85%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

341

days

Remaining Days

8,184

hrs

Operating Hours

1,904

cycles

Remaining Cycles

85

%

Confidence

Likely failure mode: External Corrosion

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

38mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-PL-132
Functional LocationHydrogen Plant / Pipeline Area 4
ManufacturerSulzer
Install Date2021-06-12
Runtime Hours8,090 hrs
Last Maintenance2025-11-13
Next Maintenance2027-04-11

AI Recommendation

Maintenance Recommendation Agent

PL-132 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-13

WO-20451 · Lubrication top-up

Closed · 2025-11-13

WO-20452 · Bearing replacement

Closed · 2025-11-13