Digital TwinHydrogen PlantPL-132
Back

Pipeline PL-132 — Digital Twin

Healthy

PL-132 · Pipeline · Hydrogen Plant / Pipeline Area 4 · Running · Reduced Load

Criticality: Low · Degradation: Normal

97%

Excellent

Failure Probability

1%

Remaining Useful Life

341 Days

Predicted Failure Mode

External Corrosion

RUL Confidence

85%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

97%

Failure probability 1%

AI Predicted

Predicted · 341d horizon

96%

External Corrosion trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration1.99 mm/s2–5 mm/sWarning-0.23/hr
Temperature44.46 °C40–70 °CNormal-0.09/hr
RPM1445.24 rpm1400–1500 rpmNormal-0.12/hr
Motor Load54.93 %50–80 %Normal-0.26/hr
Pressure5.06 bar4–6 barNormal-0.16/hr
Flow105.06 % of rated88–112 % of ratedNormal-0.19/hr
Lubrication Condition97.86 % quality70–100 % qualityNormal+0.15/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

External Corrosion cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

PL-132 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-PL-132
Functional LocationHydrogen Plant / Pipeline Area 4
ManufacturerSulzer
Install Date2021-06-12
Runtime Hours8,090 hrs
Last Maintenance2025-11-13
Open Equipment Health record