MU
Equipment HealthTank FarmP-138

Pump P-138

Low Criticality

P-138 · Pump · Tank Farm / Pump Area 3 · Mfr. GE Vernova

Health trend improving
98%

Excellent

Failure Probability

1%

Anomaly Score

1

Remaining Useful Life

365 Days

RUL Confidence

83%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

365

days

Remaining Days

8,760

hrs

Operating Hours

2,855

cycles

Remaining Cycles

83

%

Confidence

Likely failure mode: Impeller Erosion

Maintenance Strategy Optimization

Current strategy: maintenance every 6 months

From

6mo

To

8mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-P-138
Functional LocationTank Farm / Pump Area 3
ManufacturerGE Vernova
Install Date2015-05-05
Runtime Hours67,608 hrs
Last Maintenance2025-11-29
Next Maintenance2027-04-27

AI Recommendation

Maintenance Recommendation Agent

P-138 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-29

WO-20451 · Lubrication top-up

Closed · 2025-11-29

WO-20452 · Bearing replacement

Closed · 2025-11-29