MU
Digital TwinTank FarmP-138
Back

Pump P-138 — Digital Twin

Healthy

P-138 · Pump · Tank Farm / Pump Area 3 · Running · Reduced Load

Criticality: Low · Degradation: Normal

98%

Excellent

Failure Probability

1%

Remaining Useful Life

365 Days

Predicted Failure Mode

Coupling Wear

RUL Confidence

83%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

98%

Failure probability 1%

AI Predicted

Predicted · 365d horizon

97%

Coupling Wear trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration1.86 mm/s2–5 mm/sWarning-0.05/hr
Temperature41.22 °C40–70 °CNormal-0.19/hr
RPM1456.02 rpm1400–1500 rpmNormal-0.24/hr
Motor Load53.57 %50–80 %Normal-0.32/hr
Pressure5.12 bar4–6 barNormal-0.23/hr
Flow105.18 % of rated88–112 % of ratedNormal-0.02/hr
Lubrication Condition91.63 % quality70–100 % qualityNormal+0.05/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Coupling Wear cascade

Vibration Increases
Bearing Load & Wear Accelerate
Shaft Misalignment Risk Rises
Gearbox / Coupling Stress Increases
Motor Load Increases
Temperature Rises
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

P-138 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-P-138
Functional LocationTank Farm / Pump Area 3
ManufacturerGE Vernova
Install Date2015-05-05
Runtime Hours67,608 hrs
Last Maintenance2025-11-29
Open Equipment Health record