MU
Equipment HealthHydrogen PlantF-130

Furnace F-130

Low Criticality

F-130 · Furnace · Hydrogen Plant / Furnace Area 2 · Mfr. Atlas Copco

Health trend improving
96%

Excellent

Failure Probability

12%

Anomaly Score

6

Remaining Useful Life

346 Days

RUL Confidence

89%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

346

days

Remaining Days

8,304

hrs

Operating Hours

1,644

cycles

Remaining Cycles

89

%

Confidence

Likely failure mode: Tube Coking

Maintenance Strategy Optimization

Current strategy: maintenance every 24 months

From

24mo

To

26mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-F-130
Functional LocationHydrogen Plant / Furnace Area 2
ManufacturerAtlas Copco
Install Date2018-03-29
Runtime Hours16,348 hrs
Last Maintenance2026-01-20
Next Maintenance2027-04-14

AI Recommendation

Maintenance Recommendation Agent

F-130 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-01-20

WO-20451 · Lubrication top-up

Closed · 2026-01-20

WO-20452 · Bearing replacement

Closed · 2026-01-20