Furnace F-130 — Digital Twin

Healthy

F-130 · Furnace · Hydrogen Plant / Furnace Area 2 · Running · Reduced Load

Criticality: Low · Degradation: Normal

96%

Excellent

Failure Probability

12%

Remaining Useful Life

346 Days

Predicted Failure Mode

Refractory Degradation

RUL Confidence

89%

Ask "what happens if…" — change operating conditions and see the predicted consequences before they occur.

Digital Twin State Timeline

Historical → Current → AI Predicted → What-If Simulated

Historical

30 Days Ago

100%

Trailing sensor-fused health

Live

Current

96%

Failure probability 12%

AI Predicted

Predicted · 346d horizon

95%

Refractory Degradation trend

Simulated / Demo

What-If

—

Run a simulation to project this

Live Equipment Visualization

Component-level condition · click a component to inspect

Click a component to inspect its condition, sensor signals and simulate a component-level failure.

Live Sensor Panel

PLC / DCS / SCADA / IoT tags mapped to this asset

LivePLC / DCS / SCADA / IoT tags
ParameterCurrentNormal RangeStatusTrend
Vibration1.99 mm/s2–5 mm/sWarning-0.14/hr
Temperature45.06 °C40–70 °CNormal-0.31/hr
RPM1437.8 rpm1400–1500 rpmNormal-0.02/hr
Motor Load53.03 %50–80 %Normal-0.09/hr
Pressure4.92 bar4–6 barNormal-0.05/hr
Flow101.17 % of rated88–112 % of ratedNormal-0.23/hr
Lubrication Condition90.15 % quality70–100 % qualityNormal+0.14/hr

Vibration · 24h history

Warning ≥ 6 mm/s · Critical ≥ 7.5 mm/s

Failure Propagation Preview

Most probable cascade given current condition · full analysis available in What-If Simulation

Refractory Degradation cascade

Temperature Rises
Lubrication Film Breakdown Risk
Bearing Wear Accelerates
Friction & Vibration Increase
Motor Insulation Stress Increases
Machine Failure Risk Increases

AI Recommendation

Maintenance Recommendation Agent

F-130 is tracking within its expected envelope. Use What-If Simulation to stress-test operating changes before they happen.

Scenario History

Loading…

No simulations saved yet for this asset.

Asset Details

Equipment IDEQ-F-130
Functional LocationHydrogen Plant / Furnace Area 2
ManufacturerAtlas Copco
Install Date2018-03-29
Runtime Hours16,348 hrs
Last Maintenance2026-01-20