MU
Equipment HealthUtilitiesBR-178

Bearing BR-178

High Criticality

BR-178 · Bearing · Utilities / Bearing Area 1 · Mfr. Atlas Copco

Health trend improving
89%

Healthy

Failure Probability

7%

Anomaly Score

16

Remaining Useful Life

221 Days

RUL Confidence

90%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

221

days

Remaining Days

5,304

hrs

Operating Hours

703

cycles

Remaining Cycles

90

%

Confidence

Likely failure mode: Overheating

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

20mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-BR-178
Functional LocationUtilities / Bearing Area 1
ManufacturerAtlas Copco
Install Date2019-03-16
Runtime Hours77,554 hrs
Last Maintenance2025-11-19
Next Maintenance2027-01-17

AI Recommendation

Maintenance Recommendation Agent

BR-178 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Utilities Boiler Emergency Repair

Starts 2026-08-09 · 2 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-11-19

WO-20451 · Lubrication top-up

Closed · 2025-11-19

WO-20452 · Bearing replacement

Closed · 2025-11-19