MU
Equipment HealthHydrocrackerE-133

Heat Exchanger E-133

Low Criticality

E-133 · Heat Exchanger · Hydrocracker / Heat Exchanger Area 3 · Mfr. Siemens Energy

Health trend improving
91%

Healthy

Failure Probability

8%

Anomaly Score

14

Remaining Useful Life

312 Days

RUL Confidence

78%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

312

days

Remaining Days

7,488

hrs

Operating Hours

1,004

cycles

Remaining Cycles

78

%

Confidence

Likely failure mode: Tube Leakage

Maintenance Strategy Optimization

Current strategy: maintenance every 12 months

From

12mo

To

15mo

Postpone Maintenance

Equipment health remains excellent with low degradation trend, stable vibration and temperature signatures.

Asset Details

Equipment IDEQ-E-133
Functional LocationHydrocracker / Heat Exchanger Area 3
ManufacturerSiemens Energy
Install Date2018-05-26
Runtime Hours79,842 hrs
Last Maintenance2025-12-20
Next Maintenance2027-03-21

AI Recommendation

Maintenance Recommendation Agent

E-133 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2025-12-20

WO-20451 · Lubrication top-up

Closed · 2025-12-20

WO-20452 · Bearing replacement

Closed · 2025-12-20