MU
Equipment HealthHydrocrackerP-101

Recycle Oil Pump

High Criticality

P-101 · Pump · Hydrocracker / Feed Section · Mfr. Weir Group

Health trend stable
61%

Attention

Failure Probability

40%

Anomaly Score

38

Remaining Useful Life

149 Days

RUL Confidence

76%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

149

days

Remaining Days

3,576

hrs

Operating Hours

474

cycles

Remaining Cycles

76

%

Confidence

Likely failure mode: Cavitation

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

36mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-P-101
Functional LocationHydrocracker / Feed Section
ManufacturerWeir Group
Install Date2024-05-27
Runtime Hours92,638 hrs
Last Maintenance2026-06-23
Next Maintenance2026-11-27

AI Recommendation

Maintenance Recommendation Agent

P-101 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Hydrocracker Major Turnaround

Starts 2026-09-05 · 10 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-06-23

WO-20451 · Lubrication top-up

Closed · 2026-06-23

WO-20452 · Bearing replacement

Closed · 2026-06-23