MU
Equipment HealthOffsitesPL-118

Crude Interconnect Pipeline

Low Criticality

PL-118 · Pipeline · Offsites / Interconnect · Mfr. Ebara

Health trend stable
84%

Healthy

Failure Probability

15%

Anomaly Score

7

Remaining Useful Life

296 Days

RUL Confidence

76%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

296

days

Remaining Days

7,104

hrs

Operating Hours

1,287

cycles

Remaining Cycles

76

%

Confidence

Likely failure mode: Internal Erosion

Maintenance Strategy Optimization

Current strategy: maintenance every 18 months

From

18mo

To

18mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-PL-118
Functional LocationOffsites / Interconnect
ManufacturerEbara
Install Date2016-05-12
Runtime Hours31,293 hrs
Last Maintenance2026-02-13
Next Maintenance2027-03-10

AI Recommendation

Maintenance Recommendation Agent

PL-118 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-02-13

WO-20451 · Lubrication top-up

Closed · 2026-02-13

WO-20452 · Bearing replacement

Closed · 2026-02-13