Crude Interconnect Pipeline
Low CriticalityPL-118 · Pipeline · Offsites / Interconnect · Mfr. Ebara
Healthy
Failure Probability
15%
Anomaly Score
7
Remaining Useful Life
296 Days
RUL Confidence
76%
Health, Vibration & Temperature Trend
Trailing 30 days · sensor-fused signal
Remaining Useful Life
Generated by the Remaining Useful Life Agent
296
days
Remaining Days
7,104
hrs
Operating Hours
1,287
cycles
Remaining Cycles
76
%
Confidence
Likely failure mode: Internal Erosion
Maintenance Strategy Optimization
Current strategy: maintenance every 18 months
From
18mo
To
18mo
Equipment tracking within expected degradation envelope.
Asset Details
AI Recommendation
Maintenance Recommendation Agent
PL-118 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.
Recent Work Orders
WO-20450 · Vibration inspection
Closed · 2026-02-13
WO-20451 · Lubrication top-up
Closed · 2026-02-13
WO-20452 · Bearing replacement
Closed · 2026-02-13