MU
Equipment HealthSulfur Recovery UnitPL-155

Pipeline PL-155

Medium Criticality

PL-155 · Pipeline · Sulfur Recovery Unit / Pipeline Area 4 · Mfr. Emerson

Health trend stable
82%

Healthy

Failure Probability

16%

Anomaly Score

16

Remaining Useful Life

286 Days

RUL Confidence

81%

Health, Vibration & Temperature Trend

Trailing 30 days · sensor-fused signal

Remaining Useful Life

Generated by the Remaining Useful Life Agent

286

days

Remaining Days

6,864

hrs

Operating Hours

1,829

cycles

Remaining Cycles

81

%

Confidence

Likely failure mode: Weld Fatigue

Maintenance Strategy Optimization

Current strategy: maintenance every 36 months

From

36mo

To

36mo

Maintain Schedule

Equipment tracking within expected degradation envelope.

Asset Details

Equipment IDEQ-PL-155
Functional LocationSulfur Recovery Unit / Pipeline Area 4
ManufacturerEmerson
Install Date2021-07-03
Runtime Hours47,849 hrs
Last Maintenance2026-04-20
Next Maintenance2027-03-03

AI Recommendation

Maintenance Recommendation Agent

PL-155 is tracking within its expected envelope. No immediate action required; continue routine condition monitoring.

Recommended Shutdown

Shutdown Planning Agent

Sulfur Recovery Statutory Inspection

Starts 2026-10-14 · 4 days

Recent Work Orders

WO-20450 · Vibration inspection

Closed · 2026-04-20

WO-20451 · Lubrication top-up

Closed · 2026-04-20

WO-20452 · Bearing replacement

Closed · 2026-04-20